CukyTV

Le tue serie, i tuoi film, libri e giochi in un posto solo

S20E12 — Episodio 12

13 dicembre 1998 25 min
Vai ai commenti

Trama

A busy day on site: the back decking is coming along with a new undermount system. The insulation crew is hard at work inside spraying on foam insulation. Up top, Mark Schaub and his crew prepare to line the chimneys with a concrete lining poured down around bladders in each of the flues, and in the backyard, Dick Washburn shows us a unique dipping tank for stripping one of the house's old mantles of paint. In the relative quiet of the workshop, our master carpenter is fabricating a quartersawn white oak raised-panel piece for the bottom of the stairway. Finally, mason Lenny Belliveau works on the newly arrived pink granite blocks for veneering the foundation at the front of the building.

Parlane in un thread

Che impressione hai avuto?

Chi era il tuo preferito?