CukyTV

Le tue serie, i tuoi film, libri e giochi in un posto solo

S14E13 — Episodio 13

02 maggio 1992 25 min
Vai ai commenti

Trama

Work continues on the front landscaping, and Tom Wirth gives us a update on the layout. Inside, Richard Trethewey shows us the plastic tubing that has made rough plumbing proceed quickly. Stone mason Roger Hopkins is proceeding, with granite steps going in and a concrete slab poured at the front entrance. At the workshop, our master carpenter fabricates the columns architect Graham Gund has designed for the front enterance. Then we tour a Gund project outside St. Louis.

Parlane in un thread

Che impressione hai avuto?

Chi era il tuo preferito?