CukyTV

Le tue serie, i tuoi film, libri e giochi in un posto solo

S13E08 — Episodio 8

25 ottobre 1991 25 min
Vai ai commenti

Trama

Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.

Parlane in un thread

Che impressione hai avuto?

Chi era il tuo preferito?